Free template

    New pool tech
    onboarding checklist

    A one-page checklist that takes a new hire from paperwork to a solo route: forms and insurance, chemical safety on day one, truck and tools, four ride-along weeks, a skills sign-off, and check-ins at 30, 60 and 90 days.

    Gavin Batson

    Written by Gavin Batson

    Founder, Pool Pro · Updated November 24, 2026

    The onboarding checklist

    NEW POOL TECH ONBOARDING CHECKLIST
    [YOUR COMPANY NAME]
    Employee: ________________
    Start date: ________
    Trainer / lead: ________
    Pay: hourly / per stop $____
    Truck #: ________
    Route: ________
    Before day one: paperwork
    • Signed offer letter with pay rate, pay method (hourly / per stop) and start date
    • Form W-4 (federal withholding) and any state withholding form
    • Form I-9 Section 1 completed by the employee on or before day one
    • Form I-9 Section 2: review ID documents within 3 business days of start
    • State new-hire report filed (federal deadline 20 days; some states sooner)
    • Direct deposit form and payroll provider set up
    • Copy of driver's license; driving record sent to your insurer
    • Added to workers' comp and commercial auto policies
    • Required federal and state labor posters available
    • Handbook / company policies acknowledged in writing
    • Emergency contact on file
    Day one: safety and chemicals
    • Hazard communication training on every chemical they will handle
    • Where the safety data sheets (SDS) are kept on the truck and in the shop
    • How to read a product label and its hazard warnings
    • Never mix chemicals; never add water to acid; separate storage
    • PPE issued and fitted: goggles, chemical gloves, closed shoes
    • Spill response and first aid: eyewash, skin rinse, when to call 911
    • Chlorine gas and acid fume risks in enclosed equipment rooms
    • Electrical safety: breakers, wet hands, never open energized panels
    • Lifting: chemical jugs, salt bags, pumps
    • Heat illness: water, shade, breaks, warning signs
    • Dogs, locked gates and when to skip a stop
    Truck and equipment issue
    • Truck walk-around and inspection, fluids, tires, lights
    • Chemical storage and securing loads in the truck
    • Fuel card / fuel policy
    • Test kit or meter, with how to check reagent dates
    • Poles, brushes, nets, vacuum head and hose
    • Hand tools, O-rings, lube, spare baskets
    • Phone and route app login
    • Uniform shirts, hat, ID if used
    • Signed equipment issue list (what to return at exit)
    Ride-along weeks
    • Week 1: rides with you or a lead; watches, then does stops with help
    • Week 2: runs stops while the lead watches and checks every reading
    • Week 3: runs part of the route solo; lead spot-checks pools after
    • Week 4: full route solo; daily check-in on readings and notes
    • Learns customer access notes, gate codes and dog rules on the route
    • Learns how to log readings, chemicals added and photos at each stop
    Skills sign-off (lead initials each)
    • Tests FC, CC, pH, TA, CH, CYA and salt accurately ____
    • Calculates doses from gallons and readings ____
    • Knows the FC target for each CYA level ____
    • Brushes, vacuums, skims and empties baskets to standard ____
    • Backwashes / cleans sand, cartridge and DE filters ____
    • Primes a pump and finds a suction-side air leak ____
    • Reads a salt cell and cleans it safely ____
    • Spots and reports equipment problems for a repair quote ____
    • Handles a customer question politely and passes it on ____
    • Writes a clear visit note with photos ____
    30 / 60 / 90-day check-ins
    • 30 days: route times on target? Readings accurate? Any callbacks?
    • 30 days: confirm paperwork complete and first paychecks correct
    • 60 days: spot-check 5 pools after them; review customer feedback
    • 60 days: ready for repairs, filter cleans or green-pool cleanups?
    • 90 days: formal review; confirm pay, route and next skills
    • 90 days: set goals for the next 6 months
    Notes: ____________________________________________________________________
    Employee signature: ______________________   Owner / trainer: ______________________   Date: ________
    Get the full template

    Enter your email once to unlock this and every free Pool Pro tool and template.

    How to use it

    Print one per hire and keep it in their file. Work through the paperwork before the first day, do the safety section before they touch a chemical, and have the lead tech initial each skill only after watching the new tech do it on a real pool. At the end, both of you sign. If something goes wrong later, a signed sheet showing the training happened is worth having.

    Still deciding whether to hire? Start with hiring your first pool tech, which covers employee versus contractor, insurance, background checks and what a tech really costs.

    The paperwork, and the deadlines that matter

    • Form I-9. The employee completes Section 1 no later than their first day of work for pay. You complete Section 2, reviewing their identity and work authorization documents in person, within three business days of that start date. A Monday start means Section 2 is due by Thursday (USCIS, Completing Section 2). Keep I-9s in a separate file from the personnel file.
    • Form W-4 for federal income tax withholding, plus your state's withholding form if it has one.
    • New-hire reporting. Federal law requires you to report each new hire to your state's new hire registry within 20 days of the hire date. Some states require it sooner, so check your state's registry.
    • Insurance. Tell your workers' comp carrier and your commercial auto insurer before the tech drives a truck or works a route. Send the driving record to the auto insurer first.
    • Posters and notices. Federal and state labor posters are required; many states also require written pay notices at hire.

    Rules vary by state. Your payroll provider usually handles withholding and new-hire reporting, but confirm it's actually filed. This is general information, not legal advice.

    Chemical safety on day one

    Pool chemicals are the most serious hazard a new tech faces. Liquid chlorine and muriatic acid burn skin and eyes, and mixing chlorine products with acid, or with each other, can release toxic gas. Do this section before the new tech handles a single jug.

    Under OSHA's Hazard Communication Standard, employers whose workers handle hazardous chemicals must keep a written hazard communication program, keep safety data sheets readily accessible to employees during their shift, keep containers labeled, and train employees on the chemicals in their work area when they are first assigned and whenever a new hazard is introduced (OSHA, 29 CFR 1910.1200). For a pool route, that means an SDS for every product on the truck, labeled containers, and training that covers:

    • What each chemical is, what it does to skin, eyes and lungs, and what it must never be mixed with.
    • Where the SDS binder lives, and how to read a label and an SDS in a hurry.
    • The PPE you supply and when to wear it: goggles and chemical-resistant gloves at minimum for acid and liquid chlorine.
    • Storing and securing chemicals in the truck so acid and chlorine can't leak into each other.
    • What to do after a splash or a spill, and when to call 911 or poison control.

    OSHA also requires employers to assess workplace hazards and provide appropriate PPE. Some states run their own OSHA-approved safety programs with additional rules, so check with your state's occupational safety agency. Have the new tech sign that they received the training, and repeat it when you add a new product.

    The ride-along weeks

    Most new techs need two to four weeks before they can carry a full route alone. The checklist lays out four weeks, moving from watching, to doing with help, to doing alone with checks. Shorten it for someone with real pool experience; stretch it for someone new to the trade. Don't shorten the chemistry: a tech who can skim fast but misreads CYA will cost you more than a slow one. Use the weekly pool service checklist as the stop-by-stop standard during the ride-alongs.

    WeekNew techLead / owner
    1Watches, then runs stops with helpExplains every reading and dose
    2Runs every stopWatches and checks each reading
    3Runs part of the route soloSpot-checks pools after them
    4Full route soloDaily review of readings, notes and photos

    Pay attention to how you pay during training. Most owners pay hourly while a tech is learning, then decide whether to move to per-stop pay once they're running a route at speed. The trade-offs, and the minimum wage and overtime rules that still apply to per-stop pay, are in pay pool techs per stop vs hourly.

    The skills sign-off

    The sign-off turns "seems fine" into a specific list. The lead initials a skill only after watching the tech do it correctly on a customer's pool, not after explaining it. Chemistry comes first because it's where mistakes cost the most: an over-dosed pool bleaches a vinyl liner, and an under-dosed one turns green by the next visit. The FC/CYA chart and chemical calculator are good training aids, and the chemical log sheet shows them what every visit should record.

    30, 60 and 90-day check-ins

    Put the dates on your calendar the day they start. Each one takes 20 minutes and catches problems while they're still small.

    • 30 days: Are route times on target? Are readings accurate? Any customer callbacks? Confirm all paperwork is complete and paychecks are right.
    • 60 days: Visit five of their pools right after them. Look for skipped brushing, full baskets and readings that don't match the water. Talk about adding filter cleans or repairs.
    • 90 days: A real review: what's going well, what needs work, and any change to pay or route. Write it down and both sign.

    In Pool Pro, techs log readings, chemicals and photos at each stop from the mobile app, so you can review a new tech's work every day without riding along. Route optimization means a new tech gets stops in a sensible order from the first week.

    Common questions

    Do I need all this for a part-time or seasonal tech?

    Yes. I-9, W-4, new-hire reporting, insurance and chemical safety training apply to part-time and seasonal employees the same as full-time ones.

    What about a 1099 contractor?

    Contractors don't fill out an I-9 or W-4 with you, but calling someone a contractor doesn't make them one. If you set their route, hours and methods, they're likely an employee. The hiring guide explains the tests.

    Does a new tech need a certification?

    Some states and counties require a license or certification for pool work, especially on commercial pools. Check do you need a license to clean pools for your state before they start, and see CPO certification for pool service if you take on commercial accounts.

    What should the new tech get on their exit?

    The signed equipment issue list makes it simple: walk through it together, collect the truck, keys, gate codes and tools, and remove their app access the same day.

    Run your pool business from one place.

    Pool Pro handles scheduling, route optimization, chemistry logs and automatic billing. Plans start at $35/month.

    Route optimizationAutomated invoicingChemistry logs with LSI